The Quantlist checklists contained in these pages were developed by ADOT for ADOT administered projects using ADOT specifications and standards. They may be freely adapted for use by others with the following stipulations:

  • They are not intended to be an all-inclusive listing of contract requirements.
  • Their ADOT use is governed by ADOT's Construction Manual and Construction Bulletins issued by the Assistant State Engineer for Construction.
  • They are not intended to replace ADOT's electronic Quantlist system used by ADOT and its consultants.

The Quantlist system is administered by ADOT's Construction Operations Section.

Frequently Asked Questions

Quantlist Name

Standard Specification Section Number

Version
Date

Minimum Frequency

General Provisions Division 1

Bulletin Board Job Site (107) 06012011 One per project
Specific Contractor Quality Control (106) 08292006 One per month per specified material type

Grading - Division II

Earthwork (201, 202, 203) 01272010 One per Week
Furnished Water (209) 07292009 One per water source
Geotextile Fabric (208) 07292009 One per material type

Subgrade, Subases and Bases - Division III

Aggregate Bases and Subbases (303) 10132009 One per week
Cement Treated Base (304) 07292009 One per week.
Cement Treated Subgrade (302) 07292009 One per week.
Geocomposite Wall Drain (307) 12182003 One per Wall Reference #
Lean Concrete Base (305) 07292009 One per week.
Lime Treated Bases (301) 07292009 One per week.

Asphalt Roadways - Division IV

ACFC (407) ACFC-AR (414) (407/414) 06262007 One per week
Asphalt Drum / Batch Plant (406 thru 417) 06262007 One per week
Asphaltic Concrete 406/415/416/417 (406/415/416/417) 06262007 One per week
Asphalt Rubber Blending & Hot Plant Mix (415/414) 11242008 One per week
Bituminous Tack Coat (404) 07172003 One per week
Chip Seal Coat (404) 07032001 One per week

Concrete Roadways - Division IV

PCCP (Pre-Paving Quality Assurance) (401) 02022006 One per week
PCCP (Slip Form Placement and Curing) (401) 02022006 One per week
PCCP (Fixed Form Placement and Curing) (401) 02022006 One per week
PCCP (Joints, Dowels and Tie Bars) (401) 02022006 One per week
PCCP (Sawing and Sealing) (401) 02022006 One per week
PCCP (Crack Repair) (401) 02022006 One per shift when required

Drainage Facilities - Division V

Cast-in-Place Pipe (501) 12142010 One per week
Corrugated Metal Pipe (501) 12142010 One per week
Plastic Pipe (501) 05162001 One per week
Reinforced Concrete Pipe (501) 12142010 One per week

Structures - Division VI

Concrete Box Culverts (601) 04252001 One per structure
Approach /Anchor Slab with Joint (601) 12182003 One per joint
Bridge Deck Joint (601) 12182003 One per span
Bridge Deck (Superstructure) (601) 09302004 One per pour
Cast in Place Box Girder Bridge (601) 12182003 One per span
Drilled Shaft (Dry Excavation) (609) 07282005 One per week
Drilled Shaft (Wet Excavation) 609) 07282005 One per week
Falsework (601) 04252001 One per setup
Post Tensioning (602) 12082011 The first girder, plus once per anchorage to
anchorage of structure.
Post Tensioning - Grouting (602) 12082011 The first girder, plus once per anchorage to anchorage of structure.
Precast Concrete l-Beams & Box Beams (601) 12182003 One per span
Reinforcing Steel Placement (605) 10252004 Once prior to pour
Substructure (601) 12182003 One per span

Signs and Markers - Division VI

Overhead Sign Structures (606) 02022010 One per Unit
Warning Marker & Regulatory Sign Panels (606) 02022010 One per Type
Overhead Tapered Tube Structure (606) 02022010 One per unit
Roadside Sign Supports: Breakaway Posts S & W (607) 02022010 One per pour / days production
Milepost Markers (607) 02022010 One per project
Roadside Sign Supports: Perforated (607) 02022010 One per week
Overhead Sign Panels (608) 02022010 One per Type

Traffic Control Facilities - Division VII

Arrow Panels & Changeable Message Boards (701) 11142011 One per week
Pavement Markings (701-704-705-706-708) 09112008 One per application
Traffic Control Flagging Stations (701) 11142011 One per week
Traffic Control Temporary Barriers / Attenuators / Sand Barrels (701) 11142011 One per week
Traffic Control Work Zone (701) 11142011 One per week
Truck-Mounted Attenuators (701) 11142011 One per week

Traffic Signals and Highway Lighting (Poles) Division VII

Cabinets FMS (734) 05252006 One per week
Electrical Conductors (732) 05252006 One per week
Electrical Conduit (732) 05252006 One per week
Electrical Grounding (732) 05252006 One per week
No. 5 & 7 Pull Box with Extension (732) 05252006 One per week
No. 9 Pull Box (732) 05252006 One per week
Saw Cut-Vehicle Loop Detectors (735) 05252006 One per week
Traffic Signal and Hwy Light (Foundations) (731) 05252006 One per week
Traffic Signal and Hwy Lighting (Poles) (731) 02252006 One per week

Roadside Development - Division VIII

Class II Seeding (805) 11072011 One per 15 acres
Irrigation System Construction (808) 11072011 Once per controller
Landscape Construction (801 & 808) 11072011 One per month
Landscape Establishment (807) 08222011 Once every two months
Storm Water - Administrative (104) 06212011 One per project
Storm Water: BMP Inspection (810) 07052011 One per 14 Calendar day or after each 1/2" or more rain event
Storm Water: Good Housekeeping (810) 06222011 One per month
Temporary Irrigation System (805, 807, 808) 11072011 Once each three month, or as approved by the RLA

Pump House - Division VIII

Pump House Electrical Equipment (808) 06062006 One per pump house
Pump House Electrical Construction (808) 06062006 One per pump house

Guardrail Incidentals - Division IX

ET-Plus End Treatment HBA Post (AC) (905) 10062011 One per Installation
ET-Plus End Treatment (Concrete) (905) 10112011 One per Installation
FLEAT-350 End Treatment (905) 10062011 One per Installation
SKT-350 End Treatment (AC) (905) 10062011 One per Installation
SKT-350 End Treatment (Concrete) (905) 10062011 One per Installation
SRT-350 End Treatment HBA Posts (AC) SS-355 (905) 10062011 One per Installation
Quadguard System (905) 02202002 One per Installation
Thrie Beam Guardrail (905) 10062011 One per Run
W-Beam Guardrail (905) 07062011 One per Run

Other Incidentals - Division IX

Concrete Curb and Sidewalks (908) 04022001 One per week
Chain Link Fence and Gates (902) 04182005 One per 5000 LF (based on pay item)
Masonry Walls (914) 10112011 One per reference number or once a week
Mechanically Stabilized Earth Walls (914) 04272005 One per Week
Wire Fence and Gates (903) 04182005 One per 5000 LF (based on pay item)

Cable Barrier - Division IX

Brifen Wire Rope Safety Fence (905) 11252003 One per run
Median Cable Barrier & Anchor System (905) 12032002 One per run

Materials - Division X

Concrete Class S or B (1006) 01312006 One per week
Concrete Curing (1006) 06012011 One per week

Project Close Out

Field Red Lines (100) 12072009 One per Project

 

 