Library

Newsletters and Fact Sheets

  Newsletters:

  Fact Sheets:
   
   Interesting Facts about Noise
   Work Zone Safety in Arizona

Reports and Studies
The Arizona Department of Transportation makes all public decision-making documents available to the public in accordance with state and federal statutes.

The Grand Avenue corridor environmental documents are available here in PDF format.

Loop 303 to 99th Avenue

Categorical Exclusion (CE)

Final Design Concept Report (DCR)

Size

Table Of Contents

1.9MB

Executive Summary

1.6MB

Mitigation Measures

1.2MB

Chapter 1- Introduction

5.8MB

Chapter 2 - Traffic and Crash Data
Part 1
Part 2
Part 3

22.1MB

Chapter 3 - Design Concept Alternatives

2.1MB

Chapter 4 - Major Design Features of the Recommended Alternative
Part 1
Part 2

15.8MB

Chapter 5 - Itemized Project Cost Estimates

2.3MB

Chapter 6 - AASHTO Controlling Design Criteria and ADOT Roadway Design Guidelines

436KB

Chapter 7 - Social, Economic and Environmental Considerations

3.5MB

Appendix A - AASHTO Controlling Design Criteria

2.9MB

Appendix B - Design Exception Request

4.5MB

Appendix C - Agency Stakeholder Letters

2.8MB

Appendix D – Plans
Part 1
Part 2
Part 3
Part 4
Part 5
Part 6
Part 7
Part 8
Part 9
Part 10
Part 11
Part 12
Part 13
Part 14
Part 15
Part 16
Part 17
Part 18
Part 19
Part 20
Part 21
Part 22

138.3MB

 

Maricopa Association of Governments (MAG)
Grand Avenue Major Investment Study: SR 101L to McDowell Road,
Phase II report
February 2006

US 60 (Grand Avenue) Major Investment Study – Phase II
Cover and Table of Contents 1.8MB
Chapter 1 - Introduction 507KB
Chapter 2 - Socioeconomic & Environmental Conditions 2.6MB
Chapter 3 - Existing, Programmed and Planned Facilities 6.5MB
Chapter 4 - Issues and Needs Identification 155KB
Chapter 5 - Alternatives Analysis 2.0MB
Chapter 6 - Recommended Improvements 5MB
Chapter 7 - References 30KB
Appendix A - Related Studies, Plans and Programs 138KB
Appendix B - Environmental Databases 30KB
Appendix C - Previously Recorded Cultural Resources 74KB
Appendix D - Alternatives Analysis Exhibits
Part 1
Part 2
Part 3
Part 4
Part 5
  
3.4MB
4.5MB
6.9MB
6.4MB
2.2MB
Appendix E - Synchro Output - Existing LOS Analyses 73KB
Appendix F - Synchro Output - Proposed LOS Analyses 78KB
Appendix G - Unfunded Projects 57KB
Appendix H - Conceptual Cost Estimates 237KB
Appendix I - Myrtle Avenue Connection to Grand 321KB
Appendix J - Project Evaluation - Traffic Analysis 490KB

 

Environmental documents and other reports for ADOT projects will be made available on the Web site. Project specific environmental documents not currently available on this page can be requested through the Environmental Planning Group at 602.712.7767.

Documents are posted as they become available in PDF format, which requires Adobe Reader to view.

Divider

On The Move Our Valley Freeway System is part of the 2004 voter-approved Regional Transportation Plan. We are working hard with our transit partners to implement the voters’ vision and are committed to quality, safety, open communication with our neighbors, and minimal inconvenience to the traveling public.